Please use this identifier to cite or link to this item:
192.168.6.56/handle/123456789/4486| Title: | How Much Is Enough? Sizing the Deployment of Baggage Screening Equipment by Considering the Economic Cost of Passenger Delays |
| Authors: | Shaver, Russell |
| Keywords: | The Economic Cost |
| Issue Date: | 2004 |
| Publisher: | The RAND Corporation |
| URI: | http://196.189.45.87:8080/handle/123456789/4486 |
| ISBN: | 0-8330-3628-9 |
| Appears in Collections: | Economics |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 235 . Rand_Corporation.pdf | 1.65 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
