Please use this identifier to cite or link to this item:
192.168.6.56/handle/123456789/39976
Title: | The NEC 3 Engineering and Construction Contract A Commentary Second Edition |
Authors: | Eggleston, Brian |
Keywords: | Engineering contracts–Great Britain. |
Issue Date: | 2006 |
Publisher: | Blackwell |
Description: | NEC 3 took a few years longer than expected to produce. Perhaps this reflected the difficulties of amending clauses written in a unique style with minimalistic drafting. Perhaps remaining true to the original concepts of the contract inhibited change. When NEC 3 did eventually emerge in 2005 it was not the comprehensive revision which might have been expected. Some useful changes to compensation event procedures had been made, a few gaps had been plugged here and there, and a few new clauses added. At first sight it seemed that not much had changed. But getting into the detail revealed a different picture. There has been significant change – probably far more than the draftsmen intended – and not all of it for the better. |
URI: | http://10.6.20.12:80/handle/123456789/39976 |
ISBN: | 978-0-632-05386-5 |
Appears in Collections: | Building Construction |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.