Please use this identifier to cite or link to this item: 192.168.6.56/handle/123456789/39976
Title: The NEC 3 Engineering and Construction Contract A Commentary Second Edition
Authors: Eggleston, Brian
Keywords: Engineering contracts–Great Britain.
Issue Date: 2006
Publisher: Blackwell
Description: NEC 3 took a few years longer than expected to produce. Perhaps this reflected the difficulties of amending clauses written in a unique style with minimalistic drafting. Perhaps remaining true to the original concepts of the contract inhibited change. When NEC 3 did eventually emerge in 2005 it was not the comprehensive revision which might have been expected. Some useful changes to compensation event procedures had been made, a few gaps had been plugged here and there, and a few new clauses added. At first sight it seemed that not much had changed. But getting into the detail revealed a different picture. There has been significant change – probably far more than the draftsmen intended – and not all of it for the better.
URI: http://10.6.20.12:80/handle/123456789/39976
ISBN: 978-0-632-05386-5
Appears in Collections:Building Construction

Files in This Item:
File Description SizeFormat 
22.pdf3.05 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.