Title: Construction Scheduling, Cost Optimization, and Management a New Model Based on Neurocomputing and Object Technologies
Authors: Adeli, Hojjat
Keywords: Construction industry—Management.
Issue Date: 2001
Publisher: Spon Press
Description: The primary purpose of this book is to present an entirely new approach to management and scheduling of construction projects overcoming the limitations of existing methods. We start from ground zero with a most general mathematical formulation for scheduling and management of construction projects with the goal of minimizing the direct construction cost. The construction direct cost optimization problem is then solved by the robust neural dynamics model of Adeli and Park. An object-oriented information model is presented based on the new construction scheduling model, laying the foundation for a new generation of flexible, powerful, maintainable, and reusable software system for the construction scheduling problem.
URI: http://10.6.20.12:80/handle/123456789/37082
ISBN: 0-203-30223-0
Appears in Collections:Building Construction

Files in This Item:
File Description SizeFormat 
4.pdf4.91 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.